SERVICES

VERTEX has Experts that Talk the Talk and Walk the Walk.

Unlike others, VERTEX provides forensic consulting alongside traditional AEC services which allows for a 360 degree view of your project.

VERTEX Services

Experts

Need an expert for your case?

Our forensics experts work alongside AEC specialists which enhances our skills and bolsters the credibility of our expert consultants.

Find an Expert

Portfolio

VERTEX delivers innovative solutions on complex projects globally.

Since 1995, VERTEX has completed over 90,000 projects.

View Portfolio

INSIGHTS

VERTEX believes in a Lifetime of Learning philosophy.

Stay current with our industry experts as they share their insights and knowledge on the built environment.

View Insights

Grow Your Career

Join Our Team

VERTEX is looking for talented individuals to join a highly technical team of forensic consultants, design engineers, construction managers, and environmental scientists.

Learn More

Contact Us

Have a question or want to speak with a technical professional?

VERTEX is a multi-discipline firm with global coverage. Our international network of resources enables us to provide multi-national clients with the most qualified local professionals who understand the culture, language, and regulatory framework.

Call Us: 888.298.5162

Call Us

Call us at 888.298.5162.

Bronx River Parkway Northbound Exit Ramp to Yonkers Avenue

About this Project

LKB, a wholly owned subsidiary of VERTEX, was retained by Westchester County Department of Public Works to complete the study, preliminary design, final design and construction support services for this new exit ramp on the Bronx River Parkway. This project required the design of a ramp in a narrow corridor located over the Bronx River between the Bronx River Parkway and a Metro North rail line. The ramp elements include a four-span, steel bridge that connects to an existing bridge above the river and two steel sheet piling retaining walls. The bulkhead wall design included the use of helical anchor tie backs.

Other work included vehicle projections, traffic analysis and traffic signal design plans, survey and mapping, preparation of Design Approval Documents (DR/EA) for federal funding, environmental permitting, a hydraulic analysis, the preparation ofa soils report, construction support services, and public hearings and meetings.

Upon acceptance of the contract documents, LKB provided services during the bidding phase, which included responding to inquiries from prospective bidders; review of contractors’ qualifications and references; preparation of a bid summary; and recommendation of the award to the lowest responsible and qualified bidder. LKB’s construction support services during the construction phase included review and approval of detailed shop drawings, catalog cuts, and miscellaneous submittals for compliance with contract documents; review and responses to RFI’s (Request for Information) and Change Order Requests; and attendance of progress and project meetings, as necessary.

This project received the 2010 Project of the Year Award, by NYSSPE Westchester/Putnam County Chapter.

Location

Westchester County, NY

Client

Westchester County Department of Public Works

Completion

2010

Awards

2010 Project of the Year Award
New York Society of Professional Engineers, Westchester/Putnam County Chapter

This project was originally awarded to LOCKWOOD, KESSLER & BARTLETT, INC., a wholly-owned subsidiary of The Vertex Companies, LLC since January 2021.