SERVICES

VERTEX has Experts that Talk the Talk and Walk the Walk.

Unlike others, VERTEX provides forensic consulting alongside traditional AEC services which allows for a 360 degree view of your project.

VERTEX Services

Experts

Need an expert for your case?

Our forensics experts work alongside AEC specialists which enhances our skills and bolsters the credibility of our expert consultants.

Find an Expert

Portfolio

VERTEX delivers innovative solutions on complex projects globally.

Since 1995, VERTEX has completed over 90,000 projects.

View Portfolio

INSIGHTS

VERTEX believes in a Lifetime of Learning philosophy.

Stay current with our industry experts as they share their insights and knowledge on the built environment.

View Insights

Grow Your Career

Join Our Team

VERTEX is looking for talented individuals to join a highly technical team of forensic consultants, design engineers, construction managers, and environmental scientists.

Learn More

Contact Us

Have a question or want to speak with a technical professional?

VERTEX is a multi-discipline firm with global coverage. Our international network of resources enables us to provide multi-national clients with the most qualified local professionals who understand the culture, language, and regulatory framework.

Call Us: 888.298.5162

Call Us

Call us at 888.298.5162.

Emergency Bridge Deck Replacement

Project # 48512

Emergency Bridge Deck Replacement

VERTEX served as the Surety’s Consultant for the emergency replacement of a bridge deck over railroad tracks at the intersection of Metropolitan Avenue and Fresh Pond Road in Queens, New York. The original bridge was constructed in 1915 by the Long Island Rail Road and multiple overlays of asphalt and steel plates had been installed in the past as a means to remedy the deterioration of the bridge deck. The new ~$15M contract, labeled by the Executive Director of Community Affairs for the Department of Transportation Division of Bridges as “one of the toughest bridge projects” the area had in a very long time, including removal and replacement of the bridge deck and the approach slab, and steel framing repairs.

Following the termination of the original contractor, VERTEX administered a solicitation of the remaining work and assisted the surety in negotiating completion terms with the New York City Department of Transportation. Once a Completion Contractor was selected, VERTEX served as the surety’s representative, attending project meetings, preparing change orders and payment applications on behalf of the surety, and monitoring the project completion. The project was completed before the negotiated completion date to the satisfaction of the project stakeholders.

To learn more about VERTEX’s Surety Claims Consulting services or to speak with a Construction Expert, call 888.298.5162 or submit an inquiry.