Find an expert

Learn More

Find the VERTEX expert perfect for your project.

See All Experts
Route 114 Bridge over Sag Harbor Cove

About this Project

LKB undertook Design Phases I-VI, including an EPP and preliminary design of the bridge, for the replacement of the existing 10-span, 390-foot-long structure with a pre-stressed concrete continuous beam structure. The design included highway realignment, drainage improvements, MPT, roadway and navigation lighting, and construction staging plans. Major design considerations included replacement of the existing bridge with a new bridge at the same location, aesthetics of the new structure, and staged bridge construction to allow through traffic over the existing structure during construction. The newly-constructed bridge replaced a 64-year-old deteriorated structure of surpassing historic grace and elegance. The new bridge looks much like the old, with the added benefit of modern construction techniques. This was of utmost importance to local communities, which shared a nostalgic attachment to the bridge.

Location

Sag Harbor, NY

Client

New York State Department of Transportation

Completion

2001

This project was originally awarded to LOCKWOOD, KESSLER & BARTLETT, INC. (LKB), a wholly-owned subsidiary of The Vertex Companies, LLC since January 2021.

Back to Projects