SERVICES

VERTEX has Experts that Talk the Talk and Walk the Walk.

Unlike others, VERTEX provides forensic consulting alongside traditional AEC services which allows for a 360 degree view of your project.

VERTEX Services

INSIGHTS

VERTEX believes in a Lifetime of Learning philosophy.

Stay current with our industry experts as they share their insights and knowledge on the built environment.

View Insights

Grow Your Career

Join Our Team

VERTEX is looking for talented individuals to join a highly technical team of forensic consultants, design engineers, construction managers, and environmental scientists.

Learn More

Contact Us

Have a question or want to speak with a technical professional?

VERTEX is a multi-discipline firm with global coverage. Our international network of resources enables us to provide multi-national clients with the most qualified local professionals who understand the culture, language, and regulatory framework.

Call Us: 888.298.5162

Call Us

Call us at 888.298.5162.

Route 347 Design-Build, Phase 3 header
Route 347 Design-Build, Phase 3 header
Route 347 Design-Build, Phase 3 header
Route 347 Design-Build, Phase 3 header
Route 347 Design-Build, Phase 3 header
Route 347 Design-Build, Phase 3 header
Route 347 Design-Build, Phase 3 header
Route 347 Design-Build, Phase 3 header

About this Project

LKB was the lead designer responsible for highway design, drainage design, SWPPP, traffic signal design, pavement design, signage and pavement markings, WZTC, landscape architecture, sidewalks & curbs, lighting, and utilities for NYS Route 347, from Terry Road to Gibbs Pond Road in Smithtown, NY.

This fast-track, design-build project created a greenway corridor along a 1.1 mile section of roadway. The work consisted of widening NY 347 to accommodate additional travel lanes, improvements to the horizontal and vertical alignment, pavement reconstruction, new drainage systems (including recharge basins and rain gardens), traffic signals at three intersections, solar powered street lighting, ITS, pavement markings, signs, new utilities (gas main, water mains, overhead electric), sound walls, a shared use path, sidewalks, a green stop, bus shelters and extensive landscaping.

The design and construction of this $36 million project was completed in 18 months. The work was constructed in three main stages of work with traffic maintained on the roadway throughout the project duration.

This project received the 2018 Outstanding Engineering Achievement Award from the New York State Society of Professional Engineers – Long Island Chapter.

Location

Smithtown, NY

Client

New York State Department of Transportation

Completion

2018

Awards

2018 Outstanding Engineering Achievement Award
New York State Society of Professional Engineers, Long Island Chapter

This project was originally awarded to LOCKWOOD, KESSLER & BARTLETT, INC. (LKB), a wholly-owned subsidiary of The Vertex Companies, LLC since January 2021.