VERTEX uses cookies to make our website work properly and to provide the most relevant content and services to our clients and site visitors.

Accept

Smith Point Bridge Rehabilitation, William Floyd Parkway over Narrow Bay

About this Project

LKB performed construction inspection on this $5 million project to rehabilitate the Smith Point Bridge. Repairs were made to the bascule span and components, as well as the approach spans. Work on the approach spans included structural concrete repair of piers and pre-stressed beams, rehabilitation of the existing asphalt overlay. On the bascule section, there were structural steel repairs including repairs to the trunion tower, rehabilitation of the existing electric drive motors, mechanical repairs on the rack assembly, and miscellaneous work in the control tower including replacement of doors and windows.

Location

Shirley, NY

Client

Suffolk County Department of Public Works

Completion

2012

This article was originally published by LOCKWOOD, KESSLER & BARTLETT, INC. (LKB), a wholly-owned subsidiary of The Vertex Companies, LLC since January 2021.

Ready to Get Started?

Speak with an Expert

Contact Us