SERVICES

VERTEX has Experts that Talk the Talk and Walk the Walk.

Unlike others, VERTEX provides forensic consulting alongside traditional AEC services which allows for a 360 degree view of your project.

VERTEX Services

Experts

Need an expert for your case?

Our forensics experts work alongside AEC specialists which enhances our skills and bolsters the credibility of our expert consultants.

Find an Expert

Portfolio

VERTEX delivers innovative solutions on complex projects globally.

Since 1995, VERTEX has completed over 90,000 projects.

View Portfolio

INSIGHTS

VERTEX believes in a Lifetime of Learning philosophy.

Stay current with our industry experts as they share their insights and knowledge on the built environment.

View Insights

Grow Your Career

Join Our Team

VERTEX is looking for talented individuals to join a highly technical team of forensic consultants, design engineers, construction managers, and environmental scientists.

Learn More

Contact Us

Have a question or want to speak with a technical professional?

VERTEX is a multi-discipline firm with global coverage. Our international network of resources enables us to provide multi-national clients with the most qualified local professionals who understand the culture, language, and regulatory framework.

Call Us: 888.298.5162

Call Us

Call us at 888.298.5162.

Articles

Best Practices for Documenting Costs in Construction Post-Termination

September 19, 2017

Construction is fraught with challenges; following a few best practices will go a long way if terminations occur.

If it is worth doing, it is worth documenting

Project records are key to identifying and substantiating completion costs. Records will be requested and must be furnished to the defaulted party upon request. Good project records often include photographs and descriptive narrative in the daily field reports.

Change order, or ticket work, should be coded separately from base contract work

In order to allow for segregation of base contract work and change order/ticket work, it is recommended that necessary rework of the principal’s issues should be documented sufficiently and separately, with photographs and descriptive narrative. Work should be documented in the daily field reports and separately in a change order/ticket work report.

Any self-induced deficiencies or inefficiencies should also be properly noted and removed from the recoverable costs

Proper documentation and fair assignment of costs provide credibility to the recovery of completion costs. Typically, when a contractor is terminated, detailed daily reports will be kept by the completing contractor to substantiate all work performed, as these logs are the primary means of record keeping for activities occurring onsite and are especially important in disputes.[1]

In summary, when the work is not properly documented, it may create issues substantiating the cost reasonableness and necessity of the costs. Learn more in How to Measure the Reasonableness of Completion Costs Post Termination-For-Cause.


To learn more about VERTEX’s Construction Claims Consulting services or to speak with a Construction Expert, call 888.298.5162 or submit an inquiry.

Reference

  • [1] Clough, Richard H., et al. Construction Contracting: A Practical Guide to Company Management (Eight Ed.) (pp. 323 – 324). United States of America: John Wiley & Sons, 2015.  

Back to Insights