VERTEX was retained by the Client to conduct comprehensive pre-demolition asbestos and regulated/universal waste surveys of the 20-building former industrial/manufacturing plant encompassing approximately 340,000 square feet of space.
The surveys were conducted in accordance with the State of Connecticut asbestos regulations and the United States Environmental Protection Agency (USEPA) National Emissions Standards for Hazardous Air Pollutants (NESHAPs) to identify asbestos-containing materials (ACMs) and regulated materials to be abated/removed prior to the scheduled demolition of the vacant industrial/manufacturing plant.
To learn more about VERTEX’s Industrial Hygiene & Building Sciences services or to speak with an Environmental Expert, call 888.298.5162 or submit an inquiry.