Find an expert

Learn More

Find the Vertex expert perfect for your project.

Brian Francke
Brian Francke

Managing Director

Erik B. Wetzler
Erik B. Wetzler

Managing Director

Alexander Billy
Alexander Billy

Managing Director

See All Experts

Search the Insights

Learn More

Discover industry insights and knowledge from our expert team.

View All Insights

Construction Delay Claims Productivity

Vertex professionals evaluate and calculate productivity losses resulting from a variety of factors. Vertex’s experts assist our clients by:
• Identifying causes of productivity loss experienced on the project.
• Linking cause and effect of productivity impacts.
• Estimating loss of productivity through various methodologies, such as measured mile, comparative studies, earned value, industry studies, and cost methodologies.
• Preparing demonstratives and graphics to illustrate impacts and damages.

Vertex understands the difficulty in quantifying productivity losses and considers the facts, nature of impacts, and available labor data in order to produce reliable results.

Vertex’s qualified experts specialize in productivity analysis and frequently utilize industry-standard methodologies that include:

  1. Measured Mile Analysis
  2. Comparable Work Study
  3. Total/Modified Cost
  4. Industry Productivity Studies (MCAA, etc.)
  5. Earned Value Analysis

Whether evaluating delay or disruption, Vertex leverages its real-world and claims experience to provide the independent analysis necessary to demonstrate, quantify, and present the cause and effect of these impacts for meaningful results.

Need an Expert?

Vertex is unique because our forensics experts work alongside our technical professionals and are actively involved in current projects. If you need an expert witness with real-world experience, contact us.

Contact Us

Featured Experts

Dayna Anderson

Senior Managing Director and Practice Area Lead

Joseph Egan

Senior Managing Director

Andrew Sargent

Managing Director

Jeff Katz

Senior Managing Director

ZB Headshot 22
Zachary Bradshaw

Senior Managing Director

JR HEADSHOT 24
Johnathan Rice

Managing Director