Construction Delay Claims and CPM Scheduling

Construction delay claims and construction defect claims comprise the majority of construction litigation, both of which are often complex and challenging to measure, particularly without expert insight.

VERTEX’s team of Critical Path Method (CPM) scheduling experts evaluate and construct delay claims and time extension requests for clients across the construction industry on all types of projects.

Our construction delay experts employ a range of industry-recognized forensic scheduling techniques. Selecting the right delay analysis method requires assessing individual claim characteristics and project specifics. Key criteria, such as the availability of contemporaneous schedule updates, requirements of the contract documents, and the quality and/or the reliability of available construction schedules can play a role in deciding which methodology is appropriate for your situation.

VERTEX’s scheduling and claims professionals have experience preparing affirmative delay claims, as well as evaluating and responding to delay analyses. VERTEX’s experts assist our clients by:
• Identifying delay events and impacts, such as change orders, differing site conditions, design deficiencies, etc.
• Quantifying the delays through a forensic schedule analysis, establishing entitlement through evaluation of causation, and apportioning delays to responsible parties.
• Calculating and preparing cost schedules for delay damages including extended field office overhead, unabsorbed home office overhead, standby equipment, liquidated damages, actual damages, and/or lost revenue.

READ MORE ABOUT FORENSIC SCHEDULING METHODS

  1. Time Impact Analysis (TIA)
  2. Windows Analysis
  3. As-Planned vs. As-Built Analysis
  4. Impacted As-Planned Analysis
  5. Collapsed As-Built Analysis

 

VERTEX is a premier construction claims and expert services firm serving contractors, owners, sureties, design professionals, and insurance carriers on all types of projects from infrastructure to vertical construction. With a roster of established experts, VERTEX assists our clients in the preparation, analysis, review, and resolution of claims including requests for equitable adjustment, certified claims,  insurance claims (Builder’s Risk, Delay in Start-Up), and expert reports and testimony.

Need an Expert?

VERTEX is unique because our forensics experts work alongside our technical professionals and are actively involved in current projects. If you need an expert witness with real-world experience, contact us.

Contact Us

Featured Experts

Andrew- F. Borglum
Andrew F. Borglum

Senior Managing Director

Andrew Sargent

Senior Director

Jeff Katz

Senior Managing Director

Neil Miltonberger

Senior Managing Director

Michael J. DiPrimo, Jr.

Managing Director - Project Advisory

Sashi Mahtani

Senior Managing Director

James Granstra

Managing Director

Thomas L. Martin

Senior Director

Michael King

Director

Kevin Talley

Manager